Expertise
Qualified expertise for safe, reliable EV charging
A French engineering company based in Lille, with a subsidiary in Morocco. Our work rests on an AFNOR IRVE qualification, a trained and authorised team and professional test equipment.

Credentials
- Qualification
- AFNOR IRVE
- Levels
- Installation 1 & 2 · Maintenance
- Validity
- 4 years
- Insurance
- Professional liability
01Who we are
Who we are: a French SAS in Lille with a subsidiary in Morocco
D-Voltaris SAS designs, installs and maintains EV charging infrastructure. Our head office is at 229 rue de Solférino in Lille, in the Hauts-de-France region, and D-Voltaris Maroc, our subsidiary, serves clients in Morocco.
We work for developers, hotel groups, malls, corporate and taxi fleets and car dealerships, as well as more than 200 private clients in France. In the UAE, we are developing a partnership model with licensed charge point operators and property owners.
D-VOLTARIS SAS
- Head office
- 229 rue de Solférino, 59800 Lille, France
- SIREN
- 100 661 545
- Subsidiary
- D-Voltaris Maroc
- Phone
- +33 7 81 51 20 76
- services@d-voltaris.fr
02Qualifications
Qualifications: AFNOR IRVE levels 1 and 2 and maintenance
An EV charger is electrical work in its own right. The AFNOR IRVE qualification covers installation at levels 1 and 2 and maintenance, and is valid for four years.
AFNOR IRVE qualification
Installation levels 1 & 2 and maintenance. Valid for 4 years.
IRVE P1 & P2 training
Delivered by FranceForma, an AFNOR-approved training body.
IRVE maintenance training
Preventive and corrective maintenance of charging stations.
Electrical habilitation
B1V · B2V · BR · BC · H0V, kept up to date.
- IEC 61851 · Mode 3
- IEC 62196 · Type 2 / CCS2
- NF C 15-100
- EN 61557 test equipment
- Professional liability insurance
Certificates available on request
03Team
A trained and authorised technical team (IRVE P1/P2, B1V-B2V-BR-BC-H0V)
Our technical lead holds the IRVE P1 and P2 training, delivered by FranceForma, an AFNOR-approved training body, and the IRVE maintenance training. Electrical habilitations are kept up to date:
- B1VLow-voltage electrical work, including near live parts
- B2VSupervision of low-voltage electrical work
- BRLow-voltage interventions: troubleshooting, connection, testing
- BCLow-voltage isolation and lock-out (consignation)
- H0VNon-electrical work near high-voltage installations
04Method
Our method, from survey to handover
The same six steps on every site. See how we apply this method to each of our services.
- Step 01
Site audit
On-site survey: switchboard, available power, cable routes and parking layout.
- Step 02
Engineering & quotation
Load calculation, single-line diagram and a fixed price per lot.
- Step 03
Planning
Phasing agreed with the property manager, coordination with the utility.
- Step 04
Installation
Lot by lot, so the site stays operational throughout the works.
- Step 05
Commissioning
Measurements, charge-simulator tests and a signed acceptance report.
- Step 06
Maintenance
Maintenance contract with periodic visits and agreed response times.
05Quality checks
Test equipment and quality checks
Earth continuity, phase rotation, charging states: everything is checked with professional test equipment (EN 61557) and recorded in the report handed to the client.

PCE-EVSE 300Charge simulator, in its site case. 
CP / PP statesEvery charger tested in every charging state. 
Chauvin Arnoux C.A 762Voltage and phase-rotation tester. 
PCE-ECT 50Earth and continuity tester.
Also in the kit: PCE-ITE 50 installation tester.
06Commitments
Our commitments
What we commit to, in writing, on every project.
3-year warranty, parts and labour
On the equipment we supply and on our workmanship.
Fixed, itemised quotation
Every line priced, with no extras discovered mid-project.
A dedicated circuit per charger
With its own protections, in line with NF C 15-100.
Measured, documented commissioning
A test report with measured values for every charger.
Insured company
Professional liability insurance, certificate on request.
Partners disclosed in advance
You know who works on your site before the works begin.
07Field work
From our sites
Real installations, photographed by our teams. More proof in our projects.

Shared car parkOne charger per bay, one circuit per charger. 
LabellingEach charger identified and referenced. 
ProtectionsA dedicated protection enclosure next to the charger.
Next step
Let’s equip your site.
Send us the site plan, the available power and the number of spaces to equip. You receive a first estimate within 72 hours.